If your studies or work often require projects, you need our Junior Project Planning Sheets! These are also useful for planning projects around the home like DIY and craft projects. Each sheet has space for the project name and date on both sides. The first section of the planning sheet has room for a project description, which contains four ruled lines separated by a quarter inch. Below this are 15 lines for notes and 10 lines for next actions. The last section also has completion checkboxes. These are perfect for checking off items completed on a project or for using bullet journal symbols. These are Junior size sheets, but Letter size sheets are also available. Our sheets are punched for use with discbound notebooks and planners.
Planner/notebook not included.
GTD & Getting Things Done are registered trademarks of The David Allen Company.
Eleven Discs is a boutique paper shop specializing in discbound notebook and planner designs. Our sheets are made of heavyweight 32lb bond (120 gsm) paper that is 60% thicker than standard paper and can be inserted into your discbound planner many times without tearing. Our products are designed, printed, cut, and punched on site.
- Layout: ¼ inch lines, 4 project description lines, 15 lines for notes, and 10 lines for next actions with checkboxes.
- Header: Header for project name and date (on front and back).
- Quantity: 50 double-sided sheets (100 pages).
- Paper: Archival quality, heavyweight 32lb bond (120 gsm), fountain pen friendly paper.
- Dimensions: Half US Letter (Junior) size, 5 ½ × 8 ½ inches.
- Margins: ½ inch margin on punched edge and ¼ inch margins elsewhere.
- Compatibility: Fits Levenger Circa, Staples Arc, Office Depot TUL, Office by Martha Stewart, and other 8-disc junior-sized discbound systems.