Vivifying Waterproof Yellow Dog Training Leash For Pet Tracking Training Obedience Rope Long Line Leash
Specification:
Material: Durable Biothane PVC Leash and Rust-proof Zinc Alloy Hook
Length: 32ft/10m
Width: 0.78inch/2cm
Weight: 536g/18.9oz
Color: Yellow
Features :
-100%Waterproof, will not retain moisture. Applicable for variety places, such as swimming pools, beaches, parks, fields, etc
-The waterproof dog leash is strong enough to support the handling of large sized dogs and it isnt too heavy for smaller ones. Strong tensile resistance can carry 450-600 lbs
-The length of this leash is 32ft/10m, its long enough to allow your dog lots of freedom to wander during training and have a good run about without fear of them running off
-This check cord has a comfortable foam handle and does not cause the rope to scratch the skin of your hand when training ,hiking, camping or walking with your dog
-The lead is suitable for most of the pets, add to your cart now
Package Includes:
1x 10m Yellow Waterproof Dog Training Lead Leash
Waterproof Dog Leash 32ft Tracking Training Leash Durable Biothane PVC Long Lead Leash with Handle for Beach and Lake -Yellow-
Was:
$89.86
Now:
$44.93
- SKU:
- ZB293288
- Condition:
- New
- Availability:
- Free Shipping from the USA. Estimated 2-4 days delivery.