* Low Energy Consumption And Low Heat.
* Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation.
* Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F
* Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F
* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.
* Get other LED models? Please search "EDGELEC Diodes".
EDGELEC 100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V Included Light Emitting Diodes
Was:
$105.88
Now:
$52.94
- SKU:
- QT71510
- UPC:
- 611355168965
- Condition:
- New
- Availability:
- Free Shipping from the USA. Estimated 2-4 days delivery.