* Low Energy Consumption And Low Heat.
* Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation.
* Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F
* Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F
* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.
* Get other LED models? Please search "EDGELEC Diodes".
EDGELEC 100pcs 5mm Orange Lights LED Diodes Orange Lens Diffused Round Lens 29mm Long Lead DC 2V Plus100pcs Resistors for DC 6-12V Included Bulb Lamps Light Emitting Diode
Was:
$73.96
Now:
$36.98
- SKU:
- ZT22471
- UPC:
- 611355168798
- Condition:
- New
- Availability:
- Free Shipping from the USA. Estimated 2-4 days delivery.