EDGELEC 100pcs 5mm Green Lights LED Diodes Clear Round Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode
EDGELEC 100pcs 5mm Green Lights LED Diodes Clear Round Lens 29mm Long Lead -DC 3V- Plus100pcs Resistors -for DC 6-12V- Included- Bright Bulb Lamps Light Emitting Diode
Was:
$63.88
Now:
$31.94
- SKU:
- ZS44451
- UPC:
- 611355168163
- Condition:
- New
- Availability:
- Free Shipping from the USA. Estimated 2-4 days delivery.