* Low Energy Consumption And Low Heat.
* Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation.
* Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F
* Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F
* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.
* Get other LED models? Please search "EDGELEC Diodes".
EDGELEC 100pcs 5mm Blue Lights LED Diodes (White Lens) Diffused Round Lens 29mm Long Lead (DC 3V) Plus100pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode
Was:
$40.08
Now:
$20.04
- SKU:
- YSD33153
- UPC:
- 611355168859
- Condition:
- New
- Availability:
- Free Shipping from the USA. Estimated 2-4 days delivery.